Submitted by Maria.Kapsalaki on Fri, 03/03/2023 - 13:33
This work is part of two French research projects “Durabilit'air1” (2016-2019) and “Durabilit'air2” (2021-2024), that aim at improving our knowledge on the variation of buildings envelope airtightness through onsite measurement and accelerated ageing in laboratory-controlled conditions.
During a past AIVC conference, a publication of the Durabilit’air1 project has presented and discussed an experimental protocol for characterizing assembly of products for buildings’ airtightness in laboratory controlled conditions.