Rigid air barrier assemblies

Canada Mortgage and Housing Corporation (CMHC) gave the mandate to Petrone architects to prepare a designer and builder guide to describe the methods for installing rigid air barriers on building walls. The goal here is to demonstrate that it is possible, in a simple and effective manner, to respect the requirements of the National Building Code 1995 as pertains to maximum permeability of air barrier systems. The work done by the firm over the last twelve years made it possible to implement air tight systems in over fifty buildings in the Montreal area.

Measurement on thermal environment of experimental atrium (phase 1).

Interim report giving results of measurements on thermal environment and air tightness of a scale model experimental atrium carried out from February to April 1994.

Air to air heat recovery in ventilation.

Discusses the issues which influence the performance of heat recovery devices within typical building applications. It is intended to cover the three main types of devices installed in ventilation systems in residential and commercial buildings.

Pages