Submitted by Maria.Kapsalaki on Thu, 02/06/2020 - 16:46
Duct routing often poses a great challenge when planning the installation of a mechanical ventilation system with heat recovery. This is particularly true for retrofits, where the necessary space for supply and exhaust ducts was originally not accounted for. This extended summary presents an alternative approach for duct routing avoiding ducts in the dwelling, while allowing the installation of a centralized MVHR unit and the implementation of a cascading airflow through the dwelling.
The application of a continuous thermal insulation on the external face of building walls ameliorates the thermal performance of external walls and alleviates problems related to thermal bridges. However a further improvement of this insulation system may be achieved by using ventilated walls, which consist of an open ended cavity placed between an insulating board {directly applied on the external side of outer walls) and an external cladding.