Seven schools underwent an energy audit, evaluating the existing situation through measurement and simulation and looking to possible retrofit measures and their economic feasibility with the energy performance tool (EPB) as an instrument. The results are troubling. The seven schools audited are all problem buildings: hardly any insulation, windows quite air leaky, central heating systems poorly designed and no usage of an on purpose installed ventilation system.