In this paper the experiences carried out in a large church of Bologna equipped with a floor radiant panels heating plant are presented. High intensity air flows were measured not compatible with thermal comfort. Experimental data will form the basis for understanding and controlling thermal instabilities in very high halls.
In order to help the development of energy efficiency building standard in Brazil , to demonstrate state of art technologies and to encourage the use of hourly energy simulation tools the National Energy Conservation Program (PROCEL) has started the "6 Cities Project". The project is being developed in six cities around the country. For this project a standard methodology was developed and applied. The methodology consists of a survey in the local utilities to establish the highest energy consumers in the commercial and public sector.
In the district of Schwandorf a Dual Energy Management System together with various energy management adapted to parallel traditional remodelling were to be implemented beforehand in a total of 22 already existing buildings. The efficiency of these strategies with regard to energy consumption and comfort (i.e. thermal comfort of the occupants) was to be measured over a three year period. The subsequent evaluation was to result in recommendations concerning the design and operation of The EMS and the building facilities under the given conditions.
This paper outlines progress in the THERMIE Target project Energy Comfort 2000 after three and a half years. Seven of the eight buildings are under construction and the eighth will be starting on site in May 1997. The project covers the design, construction, commissioning and monitoring of the buildings which are offices, university buildings, and public and recreational buildings, together with "horizontal activities" which link the projects together.