Evaluation of an IR-controlled ventilation system in an occupied office building.

The use of IR detectors to steer the ventilation is in principle an attractive approach for optimising the ventilation according to the occupants needs. In order to evaluate the performances under real conditions, one of the BBRI office buildings in Limelette (some 31 offices with in total 51 persons and a variable occupation load) was equipped with a mechanical supply ventilation system in which each terminal is controlled by an IR detector.

Evaluation and demonstration of domestic ventilation: state of the art.

The IEA Annex 27, "Evaluation and Demonstration of Domestic Ventilation Systems" is aiming at developing tools by using the most developed computer models and equations available including modul development. Before staring up all the simulations an in depth review of the variables influencing the evaluation of a ventilation system have been done and a report is to be published. All parameters are needed to be mapped so that realistic assumptions can be made for the simulation phase.

Annex 26: Energy efficient ventilation of large enclosures. What designers really want to know about ventilation of large enclosures.

The specialists of IEA BCS Annex 26 have a clear picture of designer needs. The project objectives have not changes, but emphasis will now be place on the most relevant problems related to air motion, temperature distribution, and energy use. The development of viable solutions by expert teams from twelve countries is primarily based on investigations in existing case-study buildings. Researchers have started to demonstrate advanced experimental and numerical methods at these large enclosures ranging from atria to industrial halls.

Decision-making on domestic ventilation systems: the results of a Dutch marketing research project.

In the Netherlands, many attempts have been made to introduce and implement advanced energy efficient domestic ventilation systems. This especially applies to balanced ventilation with heat recovery, one or multizone air heating systems with he

Sick building syndrome - dangerous game with spread characters.

Outlines the history and possible causes of sick building syndrome, together with the problems of various ventilation systems.

Short term and long term measurements of ventilation in dwellings.

A study of the reliability of systems by considering the ability of different systems to maintain a required air flow rate over time is included in a subtask of IEA Annex 27 "Evaluation and Demonstration of Domestic Ventilation Systems". Measurements were performed to determine the variation in ventilation rates due to variation in climate and variation in performance of the ventilation system. The monitoring was carried out in one-family houses and apartment buildings, which are representative of the Swedish housing stock.

Pages