O. Seppänen, M. Vuolle
Year:
2003
Bibliographic info:
REHVA journal, September 2003 - 3rd quarter, pp 8-12, 1 Fig., 5 Tab., 3 Ref.

The focus of this paper is on cost effectiveness of remedial measures for existing buildings in order to reduce high summer time indoor temperatures. A typical Finnish office building was selected for the analysis. The cost items included in the analysis are: the capital cost of the remedial measure (increase of ventilation, mechanical cooling added in central air handling unit), cost of the used energy (heat and electricity), and the cost of deteriorated productivity due to high temperatures.