Experiences of the past years showed that it is possible to achieve a considerably better air flow rate in large buildings than it is targeted by the regulation of energy saving.
Blower Door Symposium 2009
This page lists the Proceedings (titles and abstracts) of the fourth International BUILDAIR Symposium on Building and Ductwork Airtightness, 1-2 October 2009, in Berlin, Germany.
Contains 22 titles and abstracts.
Volume content
Conceptual procedure to achieve good air tightness in large buildings, using the example of the EU press centre of the council of ministers | 2009 | English
Building Expertise versus Freedom of Construction!? About the handling of residual leakages in compliance with Air Tightness Limit Values from the legal point of view | 2009 | English
The airtight version of a building envelope has been accepted as a structural engineering challenge in by construction workers in Germany.