The airflows through a one family prototype building have been simulated. Supply openings in living room and bedrooms have a size of 200 and 400 cm2 respectively. The ventilation system is a passive stack ventilation system, with ventilation chimneys from kitchen, WC and bathroom. The following parameters have been studied: the supply opening areas and heights, the overflow opening areas between bedrooms and hall and between WC/bathroom and hall, the height of the ventilation chimneys and the opening and closing of living room and bedroom doors.
The design for the new Federal Building for San Francisco includes an office tower that is to be naturally ventilated. Each floor is designed to be cross-ventilated, through upper windows that are controlled by the building management system (BMS). Users have control over lower windows, which can be as much as 50% of the total operable area. There are significant differences in the performance and the control of the windward and leeward sides of the building, and separate monitoring and control strategies are determined for each side.