This article describes five blower door measurements – each made with a different objective – carried out on large buildings. Proof of air tightness is required to guarantee the operational capability of ventilation systems or to enable fire protection by
Blower door measurement of large buildings - with one or more blower systems

Year:
2005
Bibliographic info:
26th AIVC Conference "Ventilation in relation to the energy performance of buildings", Brussels, Belgium, 21-23 September 2005