Persson M P S
Year:
2000
Bibliographic info:
21st AIVC Conference "Innovations in Ventilation Technology,", Hague, Netherlands, 26-29 September 2000

Before starting to design an HVAC installation for treatment, supply and exhaust of air to and from a building the needs should be listed, transformed to requirements and their consequences analysed. Requirements lead to different amounts of airflow for their fulfilment. These needs for airflow should be calculated. The demand leading to the highest call for airflow will decide the airflow for which the equipment should be dimensioned - the dimensioning airflow.