Wagner A., Wambsganß M., Gropp T., Schindler H.
Year:
2002
Bibliographic info:
23rd AIVC and EPIC 2002 Conference (in conjunction with 3rd European Conference on Energy Performance and Indoor Climate in Buildings) "Energy efficient and healthy buildings in sustainable cities", Lyon, France, 23-26 October 2002

Within the program "Solar Optimized Buildings" which is funded by the German Ministry of Economy (BMWi), a building for the DB Netz AG has been realized and monitored. The design concept of the building is dominated by architectural solutions for ventilation, cooling and lighting of the office rooms. Due to the change of responsibilities during the design and building process, the targeted primary energy consumption of 100 kWh/m 2 y has been exceeded so far. The reasons lie primarily in the inadequate operation of the technical systems for heating, ventilation and artificial lighting.