Describes factors to be taken into account for air conditioning and heating in a theatre. Nature and purpose of the building call for an adequate supply of conditioned outdoor air, with a total supply air rate up to 69,000 m3/h. Economical use of energy was stressed. Detailed description of the problems involved with the auditorium and stage shaft are given.
New theatre climate in Berne.
Year:
1986
Bibliographic info:
Sulz Tech Rev, 1/1986, p13-16, 11 figs, 1 tab, 2 refs.