Known principles for the prevention of rain penetration and air leakage are not being applied in practice. States that rain penetration requires the simultaneous presence of water, openings and a force ; the two-stage weathertightening or "open rain screen" separates the control of these factors and allows the production of a weathertight joint under practical conditions. Outlines the causes of air infiltration and gives brief case histories to illustrate the serious problems that can arise from air leakage.
Rain and air leakage at joints
Year:
1971
Bibliographic info:
Industrialization Forum, vol.2 no.4 p7-12